Introduction: High-Power EV Charging Without a Direct Grid Connection
As heavy-duty vehicle electrification accelerates, fleet operators face a growing challenge: how can they deliver high-power DC fast charging when a dedicated grid connection is unavailable, restricted by local approval requirements, or too expensive to establish?
Installing a conventional high-power charging station may require substantial electrical infrastructure upgrades, permitting, and additional installation work. For temporary operating sites, logistics depots, commercial vehicle yards, and other grid-constrained locations, these requirements can delay electrification projects.
A mobile battery energy storage system (BESS) can separate the energy charging process from the vehicle charging process. Instead of delivering all the required power directly from the grid in real time, the system stores energy through an available AC charging connection and subsequently delivers higher-power DC charging to an electric truck.
XIAOFU POWER provides customized mobile energy storage and EV charging solutions designed around these practical operating requirements.
This article explains how a skid-mounted mobile energy storage system can use an existing 22 kW three-phase AC charging point to support approximately 150 kW DC fast charging for a heavy-duty electric truck with a 230 kWh battery.
1. What Is a Skid-Mounted Mobile Energy Storage Charging System?
A skid-mounted mobile energy storage charging system integrates battery storage, power conversion equipment, control systems, and DC fast-charging equipment into a movable industrial structure.
Unlike a conventional fixed charging station, the skid-mounted design can be positioned or relocated according to project requirements, subject to suitable transport arrangements, site conditions, and installation requirements.
The system separates two different power requirements:
- Energy replenishment: The storage system charges through an existing 22 kW three-phase AC charging point.
- High-power vehicle charging: The stored energy is delivered through a DC fast charger with an output of approximately 150 kW.
This architecture is particularly relevant when the available electrical connection has limited power capacity but the vehicle requires substantially higher charging power.
For operators who cannot establish a dedicated high-power grid connection at the charging location, it offers an alternative approach to deploying EV charging infrastructure.
2. How Does a 22 kW AC Input Support Approximately 150 kW DC Fast Charging?
The key principle is simple: the battery storage system accumulates energy over time and releases it at a higher power level when the vehicle needs to charge.
The proposed system operates in four stages.
Step 1: Recharge Through an Existing AC Charging Point
The mobile energy storage unit connects to the customer’s existing 22 kW three-phase AC charging station.
This arrangement can help projects that face restrictions on installing a new direct grid connection for a high-power charging station. Its feasibility depends on the existing electrical installation, local regulations, and approval requirements.
Step 2: Store Energy in the Battery System
The integrated battery system stores energy received from the AC input.
The stored energy provides a buffer between the relatively low-power replenishment source and the higher-power demand of the electric truck.
The usable storage capacity should be selected according to the vehicle’s battery capacity, daily energy consumption, charging frequency, available recharge time, and required operating schedule.
Step 3: Deliver High-Power DC Charging
When the truck requires energy, the integrated DC fast charger draws power from the storage system and delivers it to the vehicle.
The target output is approximately 150 kW, subject to the final system configuration and the vehicle’s charging limits.
This allows the vehicle to receive a much higher instantaneous charging power than the nominal 22 kW AC input, provided the storage system has sufficient available energy and power capability.
Step 4: Recharge and Repeat
After the charging session, the storage system can begin replenishing its energy for subsequent charging operations.
The operating schedule must account for the difference between the energy consumed during fast charging and the energy that can be replenished through the 22 kW AC connection.
This is an energy-management solution, not a way to create additional energy. Its value lies in managing when energy is accumulated and when high charging power is delivered.
3. Key Technical Considerations for a 230 kWh Electric Truck
For a truck equipped with a 230 kWh battery, designing a suitable mobile charging system requires more than selecting a 150 kW charger.
The following parameters should be evaluated together.
| Parameter | Project requirement | Engineering consideration |
|---|---|---|
| Vehicle battery capacity | 230 kWh | Determines the energy required for the desired charging session |
| AC charging input | 22 kW, three-phase | Determines the energy replenishment rate |
| DC charging output | Approximately 150 kW | Determines the maximum target charging power |
| System structure | Skid-mounted | Supports movable deployment and project-specific integration |
| Grid connection | No new direct grid connection for the storage station | Requires verification of the existing AC connection and local approvals |
| Customization | Appearance and operating UI | Supports customer branding and project-specific interface requirements |
How Long Does It Take to Recharge the Storage System?
The recharge time depends on the energy that must be replenished, the actual AC power available, conversion losses, auxiliary consumption, and charging limits.
As a simplified illustration, replenishing 100 kWh at a constant 22 kW would take approximately 4.5 hours under ideal conditions. Actual charging time will be longer when conversion losses or other operating constraints apply.
This is why the daily charging schedule matters. A 22 kW input can support high-power charging bursts, but it cannot continuously replenish energy at the same rate that a 150 kW charger may deliver it.
Can a 150 kW Charger Fully Charge a 230 kWh Truck Battery?
The nominal calculation is:
230 kWh ÷ 150 kW ≈ 1.53 hours.
However, this is only a theoretical illustration assuming the full battery capacity must be replenished at a constant 150 kW with no losses. Actual charging time depends on the initial state of charge, the vehicle’s charging curve, battery temperature, conversion efficiency, and charging limits.
For project planning, the more important question is often how much energy the truck needs per operating shift and how long the mobile storage system has available to recharge between sessions.
4. Why Choose a Skid-Mounted Mobile BESS Instead of a Fixed Charging Station?
A conventional fixed DC fast-charging station is suitable for sites with sufficient grid capacity and a permanent charging demand. However, it may not be the most practical choice for every project.
A skid-mounted mobile energy storage system offers several potential advantages.
Flexible deployment
The integrated system can be moved to suitable operating locations as project requirements change, subject to transport and site constraints.
Reduced dependence on a dedicated high-power grid connection
The system uses stored energy to deliver high-power DC charging, while replenishment takes place through the available AC charging infrastructure. It does not eliminate the need for a suitable energy source or electrical approvals.
Separation of energy replenishment and vehicle charging
Energy can be accumulated over a longer period and delivered to the truck during a shorter charging window. This can be useful when vehicle downtime is costly.
Integrated equipment
Combining energy storage, power conversion, control, and DC charging equipment into a single skid-mounted solution can simplify project integration compared with sourcing and coordinating multiple independent systems.
Project-specific engineering
Battery capacity, charging output, enclosure design, cable arrangements, control interfaces, and other specifications can be evaluated according to the customer’s operating conditions.
5. Where Can Mobile Energy Storage for EV Truck Charging Be Used?
This solution architecture may be suitable for several commercial applications.
Commercial Truck Depots
Fleet operators can use stored energy to support truck charging where existing electrical infrastructure cannot directly accommodate the required fast-charging power.
Logistics and Distribution Centers
Operators can explore mobile energy storage to support charging demand during defined operating windows without immediately committing to a permanent high-power installation.
Construction and Industrial Sites
Temporary projects may require charging infrastructure that can be relocated as equipment and operating areas change. A mobile storage system can help support this requirement where a suitable energy source is available.
Grid-Constrained Commercial Vehicle Yards
Sites with limited electrical capacity can evaluate whether low-power energy replenishment combined with higher-power charging bursts matches their vehicle utilization patterns.
Temporary EV Charging Projects
Project developers, charging service providers, and equipment rental companies may benefit from a movable solution that can be configured for different deployment requirements.
The suitability of each application depends on the required daily energy throughput, charging frequency, transport logistics, environmental conditions, and local electrical regulations.
6. Customized Mobile EV Charging Solutions from XIAOFU POWER
Standard equipment does not always meet the technical, branding, and operating requirements of a specific project.
XIAOFU POWER focuses on mobile energy storage and EV charging solutions for commercial and industrial applications, including customized integration for project partners.
For customers developing their own branded charging solutions, we can provide:
- Free product appearance customization to align the equipment with the customer’s brand identity and project requirements.
- Free operating UI customization to support customer-specific interface design and operating workflows.
- OEM/ODM cooperation for distributors, charging solution providers, fleet operators, and project developers.
- Project-specific system configuration based on target charging power, energy storage capacity, available AC input, deployment conditions, and application requirements.
Customized intellectual property ownership and usage rights can be agreed upon in the project contract. The scope of ownership should be clearly defined for the relevant design, interface, software, and other deliverables.
Our objective is to help customers develop a solution that fits their operating model rather than forcing every project into a standard product configuration.
7. What Information Is Needed to Configure a Mobile Charging System?
Before selecting a mobile BESS for electric truck charging, project developers should confirm the following information:
- Vehicle specifications: Battery capacity, charging connector, voltage range, maximum DC charging power, and expected daily energy consumption.
- Charging schedule: Number of charging sessions per day, target energy per session, and acceptable vehicle downtime.
- Available power supply: Existing AC charger specifications, available charging hours, and local electrical approval requirements.
- Energy storage requirements: Usable battery capacity, required discharge power, reserve energy, and expected operating cycles.
- Deployment conditions: Skid dimensions, transport method, site layout, ambient temperature, protection requirements, and operating environment.
- Customization requirements: Product appearance, operating UI, branding, communication protocols, and project-specific integration needs.
These details help determine whether the available 22 kW input can support the intended charging schedule and what storage capacity is required to deliver the target DC charging output reliably.
Frequently Asked Questions
Q1: Can a mobile energy storage system deliver 150 kW DC charging using a 22 kW AC input?
Yes, it can be designed to deliver approximately 150 kW DC charging by using energy stored in its battery system. The AC input replenishes the stored energy over time, while the battery and power conversion system deliver higher-power charging when required. The system must be appropriately sized for the intended charging duration and energy demand.
Q2: Does the mobile charging system require a direct grid connection?
The proposed architecture does not require a new direct grid connection to the mobile storage station if it can be recharged through the customer’s existing 22 kW three-phase AC charging point. The existing connection must still have sufficient available capacity and satisfy applicable electrical and regulatory requirements.
Q3: Is a skid-mounted mobile energy storage system suitable for a 230 kWh electric truck?
It can be suitable, provided the storage capacity, DC charging output, connector, voltage range, and operating schedule are matched to the vehicle. A 230 kWh vehicle battery capacity alone is not enough to determine the required storage-system capacity.
Q4: How should the battery storage capacity be selected?
Capacity should be based on the energy required per charging session, the number of sessions per day, the available recharge window, usable battery capacity, conversion losses, and the desired operating reserve. A project with multiple consecutive fast-charging sessions will generally require more storage capacity than one with long intervals between sessions.
Q5: Can XIAOFU POWER customize the appearance and operating interface?
Yes. XIAOFU POWER offers free customization of product appearance and operating UI for eligible projects, subject to the agreed scope. Intellectual property ownership and usage rights for customized deliverables can be defined in the project agreement.
Q6: Is this solution suitable for fleet operators and charging service providers?
Potentially, yes. It can be evaluated for commercial truck depots, logistics operations, industrial sites, and other locations where high-power charging is needed but a dedicated high-power grid connection is difficult to establish.
Conclusion: Turn Limited Grid Capacity into a More Flexible Charging Strategy
High-power EV charging does not always require energy to be delivered directly from the grid at the same power level at which the vehicle charges.
By combining a 22 kW three-phase AC input, battery energy storage, and approximately 150 kW DC fast charging, a skid-mounted mobile energy storage system can provide an alternative charging architecture for a 230 kWh electric truck.
The key to a successful project is matching energy storage capacity, charging power, and the operating schedule to the actual requirements of the fleet.
XIAOFU POWER helps commercial customers develop customized mobile energy storage and EV charging solutions, including product appearance and operating UI customization.
Planning a mobile fast-charging project for electric trucks?
Contact XIAOFU POWER to discuss your target charging power, available energy supply, storage capacity, and OEM/ODM requirements.