Global net-zero regulations are accelerating the shift to electric excavators, loaders and mining machines. Yet high-power on-site charging remains the biggest barrier.
New construction sites often have no grid connection. Utility upgrades take 6–12 months and cost a fortune — projects can’t wait.
Mid-to-heavy electric excavators carry 200–600 kWh batteries. They need 200 kW+ DC fast charging during the 30–45 min break or the afternoon shift suffers.
Fuel, maintenance, noise and emissions. More and more cities already ban diesel generators on construction sites.
Integrated mobile battery energy storage + DC fast charging — the missing link between clean power and heavy green equipment.

Mobile energy storage charging system 200 -600kwh DC Charging 200kw Storage Solar & Grid Ready

Fixed Integrated PV-Storage-Charging System 261kwh/180kw (Heating & Cooling )
Tell us your requirements and our engineers will design a tailored plan for your fleet or site.
Quick inquiry:
Name / Company / Country
Project Type (Fleet / Site / Emergency / Rental)
Required Capacity (kWh / kW)
Message / Upload files
From European zero-emission sites to remote Australian mines — XiaofuPower already serves B2B customers across multiple continents.

1MWh/480kw Mobile Energy Storage Charging (CCS 2*4)
EV Charging Station Equipment Manufacturers
(Heating & Cooling )

XIAOFUPOWER Titan 200kwh-600kwh
High Capacity Heavy Machinery Floor-Mounted Charging Stations 200kWh -600kwh Energy Storage 180kw-480kw Output for Long-Lasting Efficient
Get Exclusive Charger Solutions Tips That I Only Share With Email Subscribers
*Answer 5 quick questions and I will give you a step-by-step showing you exactly what you need to do to get solutions.
*We respect your confidentiality, and all information is protected.
Copyright © 2017, XIAOFU. Co.Ltd. All rights reserved.